Installation Procedure of Cold Applied Tape

 

Installation Procedure of Cold Applied Tape

  1. Surface Preparation:

Surface preparation of pipe steel: Derust, lamination removal, dust removal. Manual blasting should achieve level St3, mechanical blasting should achieve level Sa2 and meet requirements of SYJ4007-86. 

For surface with FBE, it needs to clean up the dust, greasiness and other dirt.

 

  1. Mix the primer evenly before using it.
  2. Use clean brushes, rollers or other mechanicalmethod to evenly apply on pipe steel. It should avoid omission, primer clot and other defects. 
  3. After 5~10 minutes since primer become dry, it should start to install the wraparound tape. The overlap of each wraparound tape is 50%~55%. It should ensure certain tension during install to make the tape surface smooth without any bubbles.

 Note:

  • Avoid fires during applying the primer.
  • Applying dosage:manual applying 10m2/L mechanicalapplying 15m2/L。

 